Work in Progress - Easter Weekend, 2009

Apr
14
2009

To some people Easter, is a time to go to church to remember the cruxification and resurrection of Jesus. To others it is a time for eating Hot Cross Buns and Chocolate Eggs. To some it is to take a walk in the countryside, visit the seaside or enjoy the thrills of a Theme Park. It may also be a time to catch up with the decorating of that spare room or to carry out various projects in the garden.

Posted By Martyn de Young read more

Work in Progress - Thursday 9th April

Apr
10
2009

Despite a very poor weather day at Woody Bay, progress continued indoors within the new shed extension. The shed floor area in the extension will be concreted soon and some of the gang were tasked with installing the full shuttering around.

Meanwhile, two wagons in the shed were worked on: Ex MOD bogie flat (being converted to a replica of L&B bogie open No.12) had some of the wooden tongue and groove sides cut to length and fitted, and Bogie Open No. 54 had a new section of planks prepared to replace the damaged and rotting floor.

Posted By Martyn de Young read more

Visit to Woody Bay - Sunday 5th April

Apr
06
2009

Nigel Thompson took a day off from the usual work parties in order to sample Woody Bay as a visitor whilst showing around a small group visiting from the Mid-Hants Railway. As always, Nigel took his camera along,and here are the results:  


 

1. AXE departs with the four carriage train at 1030

Posted By Martyn de Young read more

Work in Progress - Thursday 2nd April

Apr
02
2009

With improving weather today as the early mist gradually departed, the "Thursday Gang" constructed the wooden fence and path leading to the visitors' shed viewing area. In the morning, part of the gang carted several wheelbarrow loads of stone and dust to form the path, whilst others secured wooden rails onto the rail posts which had been installed last week.

Photos: Nigel Thompson

Posted By Martyn de Young read more

Work in Progress - Thursday 26th March Pt 2

Apr
02
2009

Last week, the Tuesday Gang was joined by Chris Dadson, who as well as joining the gang, was also able to take a few additional photos, including one of regular local reporter, Nigel Thompson ...

1. Nigel Thompson - in front of the camera for a change!

Posted By Martyn de Young read more

Work in Progress - Thursday 26th March

Mar
26
2009

The main work today for the Thursday Gang was to install several old rails as fence posts in the ground in a line above the bank to form the shed viewing area for the visitors. The holes were dug and the rails cut to length before being dropped into place, lined and levelled and then cemented in. A works train brought the sand & aggregate mix alongside the site. 

Posted By Martyn de Young read more

Work in Progress - Wednesday 25th March

Mar
26
2009

The work and exploits of the "Thursday Gang" have been regularly presented here in recent months, but much other work is also carried out - both at Woody Bay and further afield.

The very active Wednesday group of volunteers are also working on a variety of projects to maintain and enhance the railway's presence at Woody Bay.  

Posted By Martyn de Young read more

Mothers' Day

Mar
24
2009

After a week of bright and sunny early spring weather, the L&B  operated over the weekend for the Mother's Day specials. AXE with the 3 carriages performed faultlessly.

On Sunday, the good weather brought out the visitors - many with their mothers in tow to claim their free ride. The final passenger journey count for the day was 230,with both gift shop and catering recording healthy sales figures.

Look out for details of the L&Bs next Special Event...


Posted By Martyn de Young read more

Work in Progress - Thursday 19th March

Mar
20
2009

The main task today for the Thursday gang was to demolish and remove the temporary toilets from site. These buildings had served us well as the disabled and ladies toilets from 2003-2008 but have now been superseded by the permanent toilet block which was completed recently. Exmoor National Park planning agreement had required the toilet cabins to be removed as soon as possible.

Posted By Martyn de Young read more